Heating permit (Minor Source of Air Pollution - MZZO)

The city only issues a permit for minor sources of air pollution. For example, heating in family houses, cabins and other buildings with a solid fuel fireplace or gas boiler is considered a minor source of air pollution. In addition to houses, these include larger technological units and areas where work is carried out that may cause air pollution.

When do I need to apply for a permit?

  • Construction

    If you are yet to build a house to be heated by a minor source of pollution. This also applies if you are planning an extension to an existing building.

  • Occupancy approval

    Application attachments vary depending on whether or not you already have a permit for the construction of MHZZO issued by the city.

  • Modernisation/renovation

    If you already have occupancy approval for a building with a chimney already installed, and now you are going to install a fireplace or a gas boiler. Alternatively, if you are replacing your existing heating system.

Construction

Family house

Requirements to issue the permit for construction of MZZO:

  • situation drawing
  • project documentation for heating
  • project documentation for architecture
  • main and/or occasional source of pollution (e.g. gas boiler, heat pump, electric boiler)
  • technical drawing (view or section of flue gas flue)

Technological unit

Requirements to issue the permit for construction of MZZO:

  • situation drawing
  • technology description
  • projected consumption of raw materials used in the technological process
  • type of separation equipment
  • location and method of discharge of pollutants into the air
Žiadosť o povolenie stavby

Occupancy approval

For example, if you have already built a building heated by a minor source of air pollution and you are about to request occupancy approval. Application attachments vary depending on whether or not you already have a permit for the construction of MHZZO issued by the city.

Family house

If you already have a permit for construction of MZZO from the city:

  • main and/or occasional source of pollution (e.g. gas boiler, heat pump, electric boiler)
  • max. heat input
  • fuel type and consumption
  • proof of chimney inspection / inspection report
  • technical drawing (view/section of flue)

If you do not yet have a permit for construction of MZZO from the city:

  • situation drawing
  • main and/or occasional source of pollution (e.g. gas boiler, heat pump, electric boiler, etc.)
  • max. heat input
  • fuel type and consumption
  • proof of chimney inspection / inspection report
  • project documentation for heating
  • technical drawing (view / section of flue)

Technological unit

Requirements for occupancy approval of a technological unit:

  • situation drawing
  • description of implemented technology
  • projected consumption of raw materials used in the technological process
  • type of separation equipment implemented
  • location and method of discharge of pollutants into the air
  • proof of chimney examination/inspection report)

Documents:

Building Operation Approval ↗︎ Approval of Additional Permit and Building Operation ↗︎

Modernisation/renovation

If you already have occupancy approval for a building with a chimney already installed, and now you are going to install a fireplace or a gas boiler. Alternatively, if you are replacing your existing heating system. Once you have completed the application form, you will receive a receipt to pay the administrative fee of €10.

Family house

Requirements for construction of MZZO:

  • additional source of air pollution (e.g. gas boiler, heat pump, electric boiler, etc.)
  • max. heat input
  • fuel type and consumption
  • proof of chimney inspection
  • technical drawing (view or section of the flue)

Technological unit

Requirements for construction of MZZO:

  • situation drawing
  • technology description
  • projected consumption of raw materials used in the technological process
  • type of separation equipment
  • location and method of discharge of pollutants into the air
Application for operation outside of the construction procedure

How to apply for the permit

To complete the application online, you will need to use an e-ID card. Please submit paper applications to the City Hall mailroom at Primaciálne nám. 1 or send them directly to the City Hall.

If you are completing the application on behalf of another person, you will also need to attach a valid power of attorney that includes consent to the processing of personal data signed by the person in question.

The application will not be processed without the above-mentioned attachments.

Application process
1

Complete the application online or in writing with the required attachments.

2

You will need an electronic ID card (e-ID) to file online. If you do not possess an e-ID, you can print the application. You can mail or submit your application in person to the mailroom as for a written application.

3

The application should be examined within 30 days. The notice will be sent to your electronic inbox, by mail, or you can collect it in person at the City Hall Front Office.

Go to form

Contact

Oddelenie životného prostredia

Address

Magistrát hlavného mesta SR Bratislavy Primaciálne nám. 1, 814 99 Bratislava

Documents